South Pars Gas Field Development (Phases 17&18)
- The South Pars Phases 17 & 18 Gas Field Development Project, located in continuation of the field’s other phases along the eastern maritime border between Iran and Qatar, was awarded to a consortium comprising Oil Industries’ Engineering and Construction (OIEC), the Industrial Development and Renovation Organization of Iran (IDRO), and Iranian Offshore Engineering and Construction Company (IOEC). The primary objective of the scheme was to achieve a daily production rate of 50 million standard cubic meters of natural gas and 80,000 barrels of gas condensate. Spanning an area of approximately 155 hectares adjacent to Phases 9 & 10, the onshore refinery—engineered and constructed with OIEC’s active participation—was built to feed the domestic gas network and supply ethane feedstock to neighboring petrochemical complexes.
- The project was executed under the clientship of Pars Oil and Gas Company (POGC). The defined scope of work comprised engineering (basic and detailed design), procurement (sourcing main equipment, bulks, and commercial trade services), construction (site preparation, civil works, and installation of onshore refinery facilities), and full commissioning (pre-commissioning, commissioning, start-up, and initial operation).
- The plant’s overall production capacity entails 50 million standard cubic meters per day (MMSCMD) of sweet gas, 80,000 barrels per day (BPD) of gas condensate, 2,900 metric tons per day (MTPD) of liquefied petroleum gas (LPG), 2,750 MTPD of ethane, and 400 MTPD of sulfur.